C1S offers turn-key construction services from a team with experience in industrial and occupied facilities

Construction Projects

C1S has expertise in construction management services for existing facilities offering turn-key construction management by an experienced team, including industry-leading expertise in the design-build project delivery method. We complete projects on time and within budget, following the C1S way: listen, think, execute. The following construction services projects represent the range of our capabilities.

FRITO LAY—North America

Headquarters Facility

  • Facility security entrance upgrades
  • Construction management for installation of (2) 650 ton high efficiency chillers
  • Construction management for installation of 44 panel solar thermal water heating system
  • Construction for installation of cold storage underfloor solar heating system

Frito Lay Manufacturing

  • 13 site- facility project identification and overall site assessment
  • Warehouse roof repair construction management
  • HVAC unit replacement management
  • Foundation void investigation and repair
  • Conference room lighting repair

PEPSICO—North America

  • Pony chiller design and installation
  • Construction management for data center chiller installation

JOHNSON & JOHNSON—Irving and San Angelo, Texas

  • Embedded project manager to support facility operations
  • Ducted Hepa replacement
  • Kitting room conversion design-build project
  • Facility security access upgrades
  • Duct work re-sealing project and payback analysis
  • Loading dock roll up door replacement project management
  • Chilled water analysis and cleanroom expansion design
  • Gowning room renovation construction management
  • Construction management for executive conference room renovation
  • Server room construction management
  • Overhead door replacement and repair work
  • Cleanroom plenum cleaning and plenum bridge construction management
  • ADA facility upgrade construction management
  • Air cooled chiller installation construction management
  • Thermal oxidizer investigation and replacement plan development
  • Catwalk design and installation
  • Packaging room upgrades
  • Gel Fill oven installation
  • CO2 Cleaner room
  • Epoxy Floor replacement
  • Production equipment move

L-3 COMMUNICATIONS—Garland, Texas

  • Project Management for Restroom Upgrades
  • 15,000 sf, ISO7 / IS05 cleanroom installation
  • Emergency backup power for critical clean manufacturing system
  • Deionized water system upgrade for critical clean manufacturing process enhancement
  • ADA compliance upgrade for “clean-zone” restrooms and smock /gowning area
  • 5,000 sf, ISO7 / ISO5 cleanroom installation
  • Installation of chemical storage room for hazardous production materials
  • Exterior concrete work

ST. JUDE MEDICAL—Plano, Texas

  • Restroom renovation project management
  • 20,000 sf, ISO7 / ISO8 medical device manufacturing cleanroom construction management
  • Construction for 2,700 sf of semi-clean packaging / testing lab area in an existing warehouse
  • Construction management services for break area and kitchen upgrade
  • Cadaver lab renovation construction management

THE BOMB FACTORY—Dallas, Texas

  • Demolished of existing interior infrastructure
  • Removed the existing roof structure
  • Design and install new HVAC and electrical systems
  • Install new roof
  • Install a concert stage and a mezzanine level
  • Re-imagine historic building as a modern concert & events venue

REEL FX Studio—Dallas, Texas

  • Installation of architectural feature to define entry
  • Add a bathroom and break area
  • Renovate the lobby and reception areas
  • Recarpet the office areas
  • Minimize disruption to occupied spaces

RECKITT BENCKISER—Fort Worth, Texas

  • V-blender installation
  • Drying oven installation
  • Hazardous material dust control system installation

FINISAR—Plano, Texas

  • Process systems installation for manufacturing equipment relocation
  • Process chilled water system upgrade
  • Assembly room upgrade to Class 100 certified cleanroom

SMITH AND NEPHEW—Fort Worth, Texas

  • Cryogenic exhaust system installation
  • Mothers room conversion design build
  • Construction management for roof replacement
  • Construction management for janitor closet and lab renovation
  • Drain line scoping

FEDERAL HOME LOAN BANK

  • Tenant improvement design-build after hours and holiday renovation

PECAN LODGE

  • Building re-purposed to restaurant and finish out

THE GEM

  • Juice bar retail finish out

HOME DEPOT

  • Corporate office facility separation to create two addresses

MEDTRONIC

  • ISO 8 Cleanroom Installation
  • 4,000 sq. ft. assembly area renovation
  • Fire sprinkler mic remediation
  • Restroom renovations
  • Vestibule installation

VALSPAR

  • Construction Management Services for process line improvement

WESTDALE

  • Renovation and upgrade for eight buildings

MAPEI

  • Owners representative for warehouse expansion project

ALOE VERA AMERICA

  • Mold remediation project implementation