The C1S team provides industry-leading design-build expertise allowing us to overlap the design and construction phases of our projects. This reduces the project timeline and brings organization to complex and fast-track projects.
Our flexibility and agility allows us to meet the tightest of deadlines in the most critical environments.
Scope | Size | Timeline |
---|---|---|
$1.5M | 2.6K sq. ft. | 5 months |
AVOA first contracted with us to design/build a new 2,600ft Cold Room to expand their inventory storage capacity at their facility in Mission, TX. While our Project Manager and Superintendent were on-site, the Aloe Vera’s Director of Engineering elected to engage us on other projects including electrical infrastructure upgrades, a new aseptic line and an expansion to the production space.