The C1S team provides industry-leading design-build expertise allowing us to overlap the design and construction phases of our projects. This reduces the project timeline and brings organization to complex and fast-track projects.
Our flexibility and agility allows us to meet the tightest of deadlines in the most critical environments.
Scope | Size | Timeline |
---|---|---|
– | 1.5M sq. ft. | - |
Our project involved providing comprehensive design assistance for Phase 1 of a semiconductor facility in North Texas spanning 1,500,000 million square feet. Collaborating closely with the design-build contractor, we helped optimize the cooling system with a capacity of 25,000 tons. We also engineered a network of piping covering 70,000 linear feet, capable of handling 150,000 gallons per minute. Integrating 800 pieces of equipment posed challenges due to the project's scale and complexity. Seamless collaboration with the mechanical contractor was essential to navigate technical intricacies and ensure precise system integration. This collaborative effort ensured the project's success and reinforced North Texas's position as a hub for semiconductor innovation.